Messages in this thread | | | Date | Fri, 31 Mar 2017 19:51:19 +0200 | From | Peter Zijlstra <> | Subject | Re: [RFC PATCH 2/3] sched/deadline: Hierarchical scheduling with DL on top of RT |
| |
On Fri, Mar 31, 2017 at 07:44:36PM +0200, Alessio Balsini wrote: > The runtime of RT tasks controlled by CGroups are enforced by the > SCHED_DEADLINE scheduling class, based on the runtime and period (the > deadline is set equal to the period) parameters. > > sched_dl_entity may also represent a group of RT tasks, providing a rt_rq.
Such a short changelog for such a big patch..
What does it do with RT affinities and AC ?
Does it do the minimal concurrency thing; or something else? All things that should be explained and are not.
| |