Messages in this thread | | | From | Arnd Bergmann <> | Subject | Re: [GIT PULL] at91: dt for 4.6 #2 | Date | Wed, 02 Mar 2016 21:50:59 +0100 |
| |
On Wednesday 02 March 2016 17:05:22 Nicolas Ferre wrote: > A second batch of DT updates for 4.6. This time it is based on 4.5-rc3 as one > of the patches fixes an node that was changed during 4.5-rc phase. As I saw > that your "next/dt" branches are based on 4.5-rc3, I thought it wouldn't be a > problem.
Right, thanks for checking.
> Overall a pretty simple series with mainly node addition for the latest SoC > and its Xplained board. > The tag doesn't embed Alexandre's previous DT Pull-Request for 4.6 that was > based on 4.5-rc1. I verified though that it doesn't conflict with it during a > merge.
Ok, that is good too. Pulled into next/dt now.
I see that your gpg key has expired last week, you may want to do something about that, I think you can just update the date rather than creating a new key.
Arnd
| |