lkml.org 
[lkml]   [2011]   [Nov]   [14]   [last100]   RSS Feed
Views: [wrap][no wrap]   [headers]  [forward] 
 
Messages in this thread
    /
    Date
    From
    SubjectRe: linux-next: build failure after merge of the pm tree (and warning)
    Hello, Guennadi.

    On Tue, Nov 15, 2011 at 12:33:29AM +0100, Guennadi Liakhovetski wrote:
    > No, this isn't a correct fix.

    I've been looking at the code and am scratching my head about what
    happens after timeout. If test timed out (tmo == 0), it prints out
    error message and continues to the next iteration of the test loop,
    which will reinitialize the on-stack completion. This essentially
    makes the previous test run's callback_param pointer dangling. The
    completion needs to be either detached from the callback or waited
    upon even if it timed out. Am I missing something?

    Thanks.

    --
    tejun


    \
     
     \ /
      Last update: 2011-11-15 00:43    [W:0.079 / U:0.012 seconds]
    ©2003-2016 Jasper Spaans. hosted at Digital OceanAdvertise on this site