Messages in this thread | | | Date | Mon, 14 Nov 2011 15:39:57 -0800 | From | Tejun Heo <> | Subject | Re: linux-next: build failure after merge of the pm tree (and warning) |
| |
Hello, Guennadi.
On Tue, Nov 15, 2011 at 12:33:29AM +0100, Guennadi Liakhovetski wrote: > No, this isn't a correct fix.
I've been looking at the code and am scratching my head about what happens after timeout. If test timed out (tmo == 0), it prints out error message and continues to the next iteration of the test loop, which will reinitialize the on-stack completion. This essentially makes the previous test run's callback_param pointer dangling. The completion needs to be either detached from the callback or waited upon even if it timed out. Am I missing something?
Thanks.
-- tejun
| |