![]() | |||||||||||||
Messages in this thread |
* Thomas Gleixner <tglx@linutronix.de> wrote:
> The problem is that the p->last_ran value is not updated after a
> context switch. So a subsequent call to current_sched_time()
> calculates with a stale p->last_ran value, i.e. accounts the full
> time, which the task was scheduled away.
>
> Signed-off-by: Thomas Gleixner <tglx@linutronix.de>
> sched_info_switch(prev, next);
> if (likely(prev != next)) {
> - next->timestamp = now;
> + next->timestamp = next->last_ran = now;
ouch! nice catch. Also for v2.6.20.2 i think. 2.6.19 should be
unaffected.
Acked-by: Ingo Molnar <mingo@elte.hu>
Ingo
-
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in
the body of a message to majordomo@vger.kernel.org
More majordomo info at http://vger.kernel.org/majordomo-info.html
Please read the FAQ at http://www.tux.org/lkml/
| ||||||||||||
| Last update: 2007-02-22 08:53 [from the cache] ©2003-2008 | |||||||||||||